Category Archives: Uncategorized

cargo damaged surveys dubai


cargo damage surveys dubai Constellation marine surveyors is a international ship and marine consultancy firm specialized in cargo surveys,cargo recovery surveys cargo damaged surveys,ship condition surveys,hull and machinery surveys,off shore marine services,marine warranty surveys with branches over uae,uk,singapore, india and part of world. OUR SUMMARIZED DAMAGED CARGO SURVEY REPORT Our Ship and Marine Surveyors did, at the request of the subject cargo underwriters, attend at the consignee’s warehouse yard, to inspect and report on the condition of the cargo and […]

Quantity surveyors Dubai


Quantity surveyors Dubai Quantity surveyors in Dubai: Our Independent Ship & Marine Surveyors did at the request of the correspondents, attend at the consignee’s warehouse in order to carry out a survey of 2 Nos. of _____________ crates that were reported  to damaged.   Quantity surveyors Dubai – DETAILS OF SURVEY: The Quantity surveyors from Constellation attended the survey at the consignee’s warehouse at Al Awir, Ras al Khor industrial area), met the representative of the consignee and carried out […]

offshore marine services in dubai


Offshore marine services in Dubai Offshore marine services in Dubai: Our Independent Marine Surveyors undertook an inspection to ascertain the cause, nature and extent of damage to “Vessel A” caused due to contact damage by “Vessel B” and to oversee the repairs. The offshore marine services report starts with the Vessels details and Background of the “Vessel A” and “Vessel B”. It is followed by the details about the incident that took place between the two vessels. Pursuant to instructions […]

rig move masters in dubai


Rig move masters in dubai PRACTICAL RISKS OF RIG MOVING Brief  Presentation Synopsis   A Rig move Master’s Perspective-case study   Pro-active Measures with industry intelligence RELOCATION     OF A JACK-UP DRILLING UNIT – Rig move masters in dubai-CASE STUDY ON RIG MOVE The intended purpose of the operation was to relocate the jack-up drilling unit from an open sea location to a port for lay-up.  The distance was about 300 nm and the season was winter but the port lay […]

Related Posts Plugin for WordPress, Blogger...

Contact Us